First, you need to make the installation of sewer pipes, and take into account all the pipes that will be under concrete. And only then begin to work.
![](/000026.jpg)
For this we need the 4 pegs. To hammer the pegs into the floor at each corner, and cut around the thread.Then using the water level draw a dash on pegs and align the thread on dash.
![](/Podgotovka.jpg)
Now we need to make the diagonal of the same threads for bias.
![](/stygka_pola_s_uklonom.jpg)
Harvests concrete solution in the proportions, 3 shovels of sand, 3 shovels of gravel, 2 shovels cement. And concreting the bathroom makes the slope, using any instrument which will be useful to you.
![](/1446404106_zalivka-betonnogo-pola.jpg)
That's all. Concrete leave to harden for a few days. Good luck.
|